Quantcast
Jump to content


Trail Recreation Group Challenges Decision Process Regarding CCMA Closure


Recommended Posts

BLUERIBBON COALITION, INC.

NEWS RELEASE

FOR IMMEDIATE RELEASE

Contact: Paul Turcke, Esq.,

(208) 331-1807

Don Amador, BRC Western Representative,

(925) 625-6287

Date: July 8, 2009

Trail Recreation Group Challenges Decision Process Regarding CCMA Closure

Pocatello, ID (July 8) - A law-firm representing a national, trail-based recreation group submitted a letter with the Bureau of Land Management (BLM) challenging their decision-making process regarding the ongoing closure of a popular off-highway vehicle riding area in Central California. The document cites data gleaned from a recent Freedom of Information Act request filed in May 2009, by the BlueRibbon Coalition (BRC).

The letter specifically points to the fact that the agency summarily dismissing important information or questions submitted by BLM staff or by BRC consultants during the public scoping period which followed the functional closure of the of the entire 75,000 acre Clear Creek Management Area (CCMA) on May 1, 2008, to all public uses.

The letter, signed by Paul Turcke, an attorney for the BlueRibbon Coalition, highlights a number of the documents obtained, such as a memo authored by BLM experts seeking underlying data and questioning methodology relied upon by the EPA in its May, 2008 report that forms the basis for BLM's closure of the CCMA. The BLM closed the area through an emergency order in conjunction with the release of the EPA Report in 2008, but has promised to reevaluate the report and all reasonable management options in an ongoing and more robust public planning process. This is expected to result in the release of a draft environmental impact statement (EIS) in 2009.

"The EIS range of alternatives is not the place to fully concur in or reject EPA's analysis, but is instead designed to allow BLM and the public to meaningfully consider and provide input upon possible management options," the letter concludes.

The draft EIS was previously scheduled for release in January 2009, but has been delayed several times. After it is released, it will be subject to public comment and will undergo further review before BLM announces a final decision.

View document here: http://www.sharetrails.org/uploads/FOIA_CCMA_Turcke_Letter_July_8_2009_Final.pdf

# # #

The BlueRibbon Coalition is a national recreation group that champions responsible recreation, and encourages individual environmental stewardship. It represents over 10,000 individual members and 1,200 organization and business members, for a combined total of over 600,000 recreationists nationwide. 1-800-258-3742. BlueRibbon Coalition: Preserving your recreational access to public lands.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Forum Topics

    • By fox2boost
      anyone ride sxs or quads in western ma or somers ct?
    • By David Irving
      Anyone on here ride around the Farmington, Lewiston, Augusta area of Maine? I've had a wheeler for years but haven't had much luck finding legal connector trails and always end up riding little stubs. I'd love to chat about riding in the area.
    • By Dwight Williams
      Ok, so I bought a 2006 bayou 250 for 200 bucks, kid couldn't start it and had no idea why it wouldn't run, I pulled the rope and felt what I thought was valve to piston contact, he wanted 500 and I talked him down to 200 and brought it home.  Sure enough, timing was way far out, timing chain incredibly loose.  So for fun I re-tensioned the timing chain and re timed it, got about 120lbs of compression, pretty low.  I cannot get the chain very tight but the the tensioner seems to work fine, the chain guides don't look very worn.  Also, when I took the head off the valves don't look bent and the piston has no discernible marks on it.  Is this an interference engine?  I sure thought I felt some contact with the pull rope but maybe no permanent damage was done?  Anyway, I plan on doing a full top end job as well as timing chain tensioners and hopefully that'll cure it.  Is there any reason other than chain stretch (I measured it and it's ok) or guide wear that would cause the chain to be so loose?  Thanks!
       
    • By Jordan Ritzman
      Any riders in western wa
    • By 4tracker
      So many things can go wrong, while out riding, even when with others, when getting away from the group! Try to always ride with at least one other person! If your over 50 and ride alone let me know, I'll try to go with you. I know the trails pretty good, up north, around St Helen, Mi. or I'll try to try areas of the state your more accustom to. I know its too cold now, but spring will be here before you can blink an eye lol
      I can ride with the slowest dude in the pack, to WOT! Get in touch before season starts for more inf. Thanks, Steve



       
       
×
×
  • Create New...